Skip to main content
Skip to main content
Who We Are
60-Plus Years of Industrial Innovation
About Us
Safety
Workforce Development
Community Investment
Sustainability
Diversity & Inclusion
What We Do
Services
Sectors
Offices
Innovation & Technology
Services Overview
Shutdowns, Turnarounds & Outages
Construction
Equipment, Rigging & Specialized Transportation
Maintenance
Modular Fabrication
Pipe Fabrication and Bending
SIPA (Soft Crafts)
Vessel and Steel Fabrication
Industrial
Rope Access
Environmental & Civil
Specialized Welding Services
NDE & Inspection
Sectors
Liquefied Natural Gas (LNG)
Refining, Chemical, and Petrochemical
Waste Management and Reuse
Power Generation
Pulp and Paper
Pharma/Life Sciences
Advanced Manufacturing
Aerospace
Biofuels
Nuclear
Data Center Infrastructure Services
Midstream
Offices Overview
Baton Rouge, Louisiana
Beaumont, Texas
Corpus Christi, Texas
Decatur, Alabama
Freeport, Texas
Geismar, Louisiana
Hahnville, Louisiana
Houston, Texas
Lake Charles, Louisiana
New Iberia, Louisiana
Paris, Texas
Pensacola, Florida
Port Allen, Louisiana
Port Lavaca, Texas
Salt Lake City, Utah
Innovation and Technology
Setting the Pace
Our Estimating Systems
CraftTrax®: Personnel Logistics System
WinPCS®: Project Control Systems
TRAM® Solutions
Drones & Robotics
Pipe Fabrication and Bending
TSS – Rope Access
Information Technology
Projects
Careers
BE A PART OF SOMETHING BIG
Job Openings
Opens new window
Why Turner Industries?
Job Openings
Training and Upskilling
College Program
Benefits
Employee Documents
News & Media
Latest
Turner Industries Opens New Operations Facility in Salt Lake City, Utah
Click Here
News
Company Magazine
Corporate Responsibility Report
Video Library
Contact
Headquarters
8687 United Plaza Blvd.
Baton Rouge, LA 70809
Call us
225-922-5050
800-288-6503
(Toll-Free)
Contact Us
Frequently Asked Questions
Procurement
Phone Directory
Search
Clear
Search
EN
ES
FR
NL
Turner Non-Conformance Report
Non-Conformance Report
LinkedIn
This field is for validation purposes and should be left unchanged.
Non-Conformance Report. Rev:
*
Revision #
Date
MM slash DD slash YYYY
Report No.
P.O. No.
Invoice No.
Piece No.
Report No.
Type of Non-Conformance (Check all that apply)
Wrong Material
No Identification
Improper Fit-Up
Damaged in Shipping
Substandard
Not to Specification
No Mill Test Reports
Not Stenciled
Not Properly Cleaned
Inadequate Weld
Other (Describe Below)
Type of Non-Conformance (If "other" was selected above)
Description of Non-Conformance
Describe the nonconformance clearly and concisely, referencing relevant documents/drawings (e.g., Crew did not install per drawing No. E120A-IA-SK01 and installed the window frame flush with the brick instead of recessed as per engineered documents [cite: 37, 38]).
QC Signature / Date (MM/DD/YY)
Root Cause Analysis
Determine and state the root cause (e.g., Lack of attention of detail in the execution of the work [cite: 41])
Proposed Disposition
Describe the proposed action to address the nonconformance (e.g., Cut loose installed anchors and reset frame as per the engineered drawings [cite: 43, 44])
Estimated Hours to Complete
QC Signature / Date (MM/DD/YY)
Cost Estimate for Corrective Action
Estimated Labor Cost
Estimated Material Cost
Other Estimated Costs
Total Estimated Cost
Approved Disposition
Describe the Final Approved Disposition / Resolution
TIG Site Superintendent Signature
Signature (Name) / Date (MM/DD/YY)
QC Manager’s Signature
Signature (Name) / Date (MM/DD/YY)
Client / AI Signature
Signature (Name) / Date (MM/DD/YY)
Corrective Action Completed
Confirmation that the corrective action has been completed
QC Signature
Signature (Name) / Date (MM/DD/YY)
Client / AI Signature
Signature (Name) / Date (MM/DD/YY)
Remarks
Enter any final remarks or lessons learned.