Turner Industries is proud to be partnering with Shell Deer Park on the installation of its new OP3 Cold Box, a significant project that began in early 2024. This undertaking encompasses everything from foundational civil work to complex mechanical installations.

The project kicked off with the installation of underground helical piles and foundations, with the majority of the civil work reaching completion in the fourth quarter of 2024. The scope of work is extensive, including underground and foundational elements, the installation of the new Cold Box itself, a large steel structure, and a new stair tower. A key aspect of the project also involves integrating these new components by tying them back into the existing unit.

PROJECT QUICK FACTS


The OP3 Cold Box project utilized a strategic construction approach for its modular components. Module 3 was built directly in place. In contrast, Modules 4, 5, and the stair tower were pre-assembled near the installation area, then lifted and set into their final positions


The site supervision included: Eric Williams – Construction Manager, Dylan Daigle – Project Field Engineer, Humberto Guevara – Pipe Supervisor, Efrain Garza – Pipe Supervisor, Edgar Amaya – Steel Supervisor, Silvia Torres – Safety Manager, Rene Barrera – QC Manager, and Jose Zamora – SIPA Supervisor.