Skip to main content
Skip to main content
nonconformance

Turner Non-Conformance Report

Non-Conformance Report

  • This field is for validation purposes and should be left unchanged.
  • Revision #
  • MM slash DD slash YYYY


  • Describe the nonconformance clearly and concisely, referencing relevant documents/drawings (e.g., Crew did not install per drawing No. E120A-IA-SK01 and installed the window frame flush with the brick instead of recessed as per engineered documents [cite: 37, 38]).

  • Determine and state the root cause (e.g., Lack of attention of detail in the execution of the work [cite: 41])

  • Describe the proposed action to address the nonconformance (e.g., Cut loose installed anchors and reset frame as per the engineered drawings [cite: 43, 44])

  • Cost Estimate for Corrective Action


  • Approved Disposition

    Describe the Final Approved Disposition / Resolution
  • Signature (Name) / Date (MM/DD/YY)
  • Signature (Name) / Date (MM/DD/YY)
  • Signature (Name) / Date (MM/DD/YY)

  • Corrective Action Completed

    Confirmation that the corrective action has been completed
  • Signature (Name) / Date (MM/DD/YY)
  • Signature (Name) / Date (MM/DD/YY)

  • Enter any final remarks or lessons learned.