New Iberia Facility

The addition of Turner Industries’ New Iberia facility, in 2021, expands our capacity and creates the industry’s most capable module fabrication contractor. The facility is the cornerstone of our Gulf of Mexico Operations, which strengthens and diversifies the company’s current service offerings for opportunities with both new existing clients.

YARD CAPABILTIES

  • 95-Acre Stabilized Fabrication Yard
  • 420′ Primary Dock Capable of Accommodating 100′ x 400′ Barges
  • 12′ Water Depth to Open Water
  • 6,000-Ton Load Out Capability
  • Combined 90,000-Square-Feet of Indoor Fabrication Space
  • 30,000-Square-Feet of Indoor Storage Facilities
  • Large Fabrication Shop Consists of Eight 20-Ton Overhead Cranes With 70′ Hook Height​
  • Small Fabrication Shop Consists of Two Bays With Four 10-Ton and Four 5-Ton Overhead Cranes

Iberia Yard History

1994
Fluor cleared out 48-acres of sugar cane fields and utilized the space at the Port of Iberia to fabricate Arco Alaska’s GHX-2 Project. Among the largest ever built at the time, 26 modules totaling 36,712-tons are fabricated and barged to Prudhoe Bay, Alaska.
1998
Dynamic Industries acquired the yard’s assets and expanded the site’s footprint.
January 2003 to July 2004
El Paso Cameron Highway Project
Oil & Gas
Deepwater, Gulf of Mexico


Project Highlights:
Project Consisted of a 3,500-Ton Production Deck for High Island A5C, a 1,500-Ton Cellar Deck Module and 2,500-Ton Production Deck Module for Ship Shoal 332 B, and a 200-Ton Bridge to Connect Ship Shoal 332 A & B Platforms
Total Weight – 7,500 Tons
Man Hours – 587,000
March 2011 to June 2012
Vale Long Harbor
Nickel Processing Plant

Newfoundland, Canada


Project Highlights:

25 Modules: 18 Equipment Modules and 7 Building Modules
Total Weights – 975 Tons
Man Hours – 900,000
Peak HC 600
September 2015 to August 2017
Shell – Appomattox Modules
Oil & Gas

Deepwater, Gulf of Mexico


Project Highlights:
Total Weight - 3,300 Tons
Man Hours - 450,000
May 2019 to July 2020
LyondellBasell
PO/TBA Project

Channelview & Bayport, Texas


Project Highlights:
43 Process & Pipe Rack Modules
Total Weight – 8,100 Tons
Man Hours – 750,000
Peak HC 500
2021
Turner Industries acquires the yards assets and headquartered the company’s Gulf of Mexico Operations at the site.
Previous
Next

The facility could fit 72 football fields within property lines.

The largest fabrication bay could hold 5 Saturn V rockets, laying side by side.

Via the Gulf Intracoastal Waterway, you could ship 923 elephants on one barge.