Methanex G-1 Turnaround
The Methanex G-1 Turnaround was the first major mechanical turnaround since the reconstruction of the Geismar 1 Plant.
The event was spearheaded by Turner’s Turnaround Services Group, was supported by Turner Specialty Services (who provided hydro blasting, vacuum trucks, water jet cutting, and torquing services), our specialized welding services group, Turner’s SIPA group, our Pipe Fabrication and Equipment Division.
Location: Geismar, Louisiana
project quick facts
- Peak Headcount: 525
- Workhours: 220,000
- OSHA Recordables: ZERO